Radstock Level Crossing
In reference to Mr M
remarks of the
5th Instant I have to state that there are no physical difficulties
connected with carrying a bridge over the railways at Radstock which
an engineer of ordinary capacity cannot readily get over, but he has
altogether misunderstood my argument.
If there were only one railway company,
which had carried their lines across a turnpike road on the level and
this railway ran parallel and quite close to a small stream as frequently
happens and the Board of Trade were authorised by any general or special
act to call upon the railway company to substitute a bridge in lieu
of the level crossing, the order would simply direct the railway company
to carry the public road over the railway by a bridge, but the order
would not mention or take cognisance of a second bridge for carrying
the road over the stream; that would simply follow as a matter of course
and form part of the works for carrying the raised road over the railway
and over the closely adjacent stream, and there is no admitted
physical difficulty in doing this: it is a mere question of greater
or less expense.
First imagine that in addition to a stream
that there was also a railway adjacent and you have the exact
case of the Somerset and Dorset Railway Company which when it applied
to Parliament for powers to cross the turnpike road on the level, knew
well that the Bristol and North Somerset Railway Company had authority
to cross the same turnpike road on the level and the works were in progress
and thus an increase of the cost of their bridge (Somerset and
Dorset) for the raised road over their line, would be further enhanced
by having to provide an arch over the Bristol and North Somerset Railway,
as well as for the arch over the stream, unless they made some great
diversion of the road and brought it down by a descent of 1 in 30 to
the existing road between the lines of railway I do not say that
the Somerset and Dorset could not legally do so: neither do I say that
such a mode of proceeding would not be very inconvenient to the public,
but I do hold that if they determined to do this it is for them to find
out the means of complying with the clauses which govern the inclinations
of the approaches to bridges, and not for the Board of Trade to admit
that there are any physical difficulties in carrying a public road over
one or two lines of railway and a stream.
2. It must be recollected that both the
Bristol and North Somerset and the Somerset and Dorset Railway Companies
both in the first instance proposed to carry the turnpike road across
the railway by bridges: - and when they subsequently, separately, and
at different times applied for authority to cross it on the level, they
were opposed by the road authorities and by reports from the Board of
Trade. It seems to me therefore that the records of the proceedings
(which are usually printed) which took place before the select committee
which sanctioned these separate level crossings should be carefully
looked through and the reasons which were assigned by the Counsels for
the railway Companies that induced the Committees to grant these very
objectionable level crossings ascertained. I was not present but I do
know that the common argument which is brought forward to grant a level
crossing in opposition to a report from an officer of the Board of Trade,
is that if the level crossing is found to be dangerous or objectionable,
it is always open for the Board of Trade to order a bridge: and in my
opinion it should be ascertained whether this was done in either of
these cases so that it might be stated to the Court when the
Mandamus is applied for.
3. The effect of the order for each company
to build a bridge would be that the cost to each would be diminished
to one half if they took the advice of the Board of Trade and each built
one half of the bridge.
W Yolland 12th July 1877
|